Epiphone (A00936) November 27, 2024 R2HUncategorized Set Up. Set up. Strings removed. Electronics, truss rod cover and machine heads removed. Electronics refitted. Fret board masked for cleaning or levelling. Machine heads dismantled. Machine heads reassembled, adjusted, lubricated and refitted. Fret board unmasked and lemon oiled. Truss rod cover refitted. Set up with new machine head slip washers and new strings.