Birkett and Blackwell (A00934) November 27, 2024 R2HUncategorized Set Up. Set up. Strings and saddle removed. Fret board masked for cleaning or levelling. Machine heads removed. Machine heads adjusted, lubricated and refitted. Fret board unmasked and lemon oiled. Saddle refitted. Set up with new bridge pins and new strings.