Squire (A00858) December 10, 2023 R2HUncategorized Set Up. Set up. Strings and switch plate with electronics removed. Scratch plate and pick ups removed. Fret board masked for cleaning or levelling. Pick ups refitted with new springs. Machine heads removed. Fret board unmasked and lemon oiled. Scratch plate refitted. Machine heads adjusted, lubricated and refitted. Set up with new pick up springs and new strings.