Eros (A00596) August 4, 2021 R2HUncategorized Set Up. Set up. Neck, saddle and truss rod cover removed. Sound board straightening. Fitting new brace. Brace fitted. Clamps removed. Neck temporarily fitted. Machine heads removed. Machine heads dismantled. Machine heads reassembled, adjusted, lubricated and refitted. Fret board masked for cleaning or levelling. Fret board unmasked and lemon oiled. Saddle and truss rod cover refitted. Set up with new strings and new bridge pins.