Zither Banjo (A00450) December 22, 2019 R2HUncategorized Set Up. Fit New Skin. Set up. Fit new skin. Strings, bridge and machine heads removed. Drum head, tail piece and pot removed from resinater. Pot dismantled. Skin removed. Pot reassembled with new skin. Fret board masked for cleaning or levelling. Fret board unmasked and lemon oiled. Machine heads lubricated and refitted. Drum head, pot and tail piece refitted. Set up with new strings and drum skin.